DIVISION E2.00 - Earthwork
This Section is still under construction.
E2.01 - Clearing and Grubbing
E2.02 - Excavation and Embankment
- Excavation & Embankment - Description of Materials and General Construction
- Excavation & Embankment - Embankment Construction (Part 1)
- Excavation & Embankment - Embankment Construction (Part 2)
- Excavation & Embankment - Unsuitable & Undercut Excavation
- Excavation & Embankment - Measurement & Payment
E2.03 - Channel Excavation
E2.04 - Test Holes
E2.05 - Reserved
E2.06 - Reserved
E2.07 - Structural Excavation and Backfill
E2.08 - Flowable Fill
E2.09 - Borrow
E2.10 - Reserved
E2.11 - Removal of Structures and Obstructions and Existing Portland Cement Concrete Pavement, Curb and Sidewalk
Return to Part E - Standard Construction Procedures And Equipment.