Jump to content

DIVISION E2.00 - Earthwork

From Delaware DOT Construction Manual

This Section is still under construction.

E2.01 - Clearing and Grubbing

E2.02 - Excavation and Embankment

E2.03 - Channel Excavation

E2.04 - Test Holes

E2.05 - Reserved

E2.06 - Reserved

E2.07 - Structural Excavation and Backfill

E2.08 - Flowable Fill

E2.09 - Borrow

E2.10 - Reserved

E2.11 - Removal of Structures and Obstructions and Existing Portland Cement Concrete Pavement, Curb and Sidewalk



Return to Part E - Standard Construction Procedures And Equipment.