DIVISION E7.00 - Miscellaneous Construction
This Section is still under construction.
E7.01 - P.C.C. Curb, Integral P.C.C. Curb, P.C.C. Monolithic Median and Curb Openings
E7.02 - Triangular Channelizing Islands
E7.03 - Reserved
E7.04 - Reserved
E7.05 - P.C.C. Sidewalk, Curb Ramps, and Sidewalk Detectable Warning System
E7.06 - Monument
E7.07 - RipRap
E7.08 - Geotextiles
E7.09 - Perforated Pipe Underdrains
E7.10 - Water Services
E7.11 - Sanitary Sewer System
E7.12 - Reserved
E7.13 - Reserved
E7.14 - Reserved
E7.15 - Reserved
E7.16 - Reserved
E7.17 - Reserved
E7.18 - Reserved
E7.19 - Reserved
E7.20 - Guardrail
E7.21 - Guardrail End Sections & Transition
E7.22 - High-Tension Cable Barrier
E7.23 - Concrete Barrier
E7.24 - Impact Attenuator
E7.25 - Reserved
E7.26 - Reserved
E7.27 - Fence
E7.28 Thru E.7.59 - Reserved
E7.60 - Pavement Milling & Rumble Strips
E7.61 - Reserved
E7.62 - Saw Cutting & Butt Joints
E7.63 - Initial Expense/De-Mobilization
Return to Part E - Standard Construction Procedures And Equipment.