DIVISION E2.00 - Earthwork
E2.01 - Clearing and Grubbing
E2.02 - Excavation and Embankment
- Excavation & Embankment - Description of Materials and General Construction
- Excavation & Embankment - Embankment Construction (Part 1)
- Excavation & Embankment - Embankment Construction (Part 2)
- Excavation & Embankment - Unsuitable & Undercut Excavation
- Excavation & Embankment - Measurement & Payment
E2.03 - Channel Excavation
E2.04 - Test Holes
E2.05 - Reserved
E2.06 - Reserved
E2.07 - Structural Excavation and Backfill
E2.08 - Flowable Fill
E2.09 - Borrow
E2.10 - Reserved
E2.11 - Removal of Structures and Obstructions and Existing Portland Cement Concrete Pavement, Curb and Sidewalk
DIVISION E3.00 - Bases
E3.01 - Graded Aggregate Base Course
E3.02 - Stone
- Special Provision 304501 - Permeable Treated Base
- Special Provision 304502 - Soil Cement Base Course
DIVISION E400 - Bituminous Paving Equipment
E4.01 - Bituminous Pavement
- Bituminous Pavement - Description, Materials, & Construction
- Bituminous Pavement - Measurement & Payment
E4.02 - Bituminous Pavement Materials, Patching
E4.03 - Bituminous Pavement Materials for Temporary Roadway Materials
DIVISION E5.00 - Rigid Pavement
E5.01 - Portland Cement Concrete Pavement
E5.02 - Reserved
E5.03 - Patching Portland Cement Concrete Pavement
E5.04 - Crack and Joint Sealing
E5.05 - Portland Cement concrete Patching, Partial Depth
DIVISION E6.00 - Structures
E6.01 - Pipe Culverts
E6.02 - Drainage Structures
E6.03 - Reserved
E6.04 - Temporary Works
E6.05 - Driven Piles
- Driven Piles - Description and Materials
- Driven Piles - Restrikes & Cutoffs
- Driven Piles- Storage, Handling & Installation
- Driven Pile - Measurement & Payment
E6.06 - Drilled Shafts
E6.07 - Mechanically Stabilized Earth Walls
- Mechanically Stabilized Earth Walls - Description, Materials, & Construction
- Mechanically Stabilized Earth Walls - Measurement & Payment
E6.08 - Permanent Sheet Piles
E6.09 - Reserved
E6.10 - Concrete Structures
E6.11 - Concrete Reinforcement
E6.12 - Precast Concrete
- Precast Concrete - Description and Materials
- Precast Concrete - Design, Working Drawings, and Manufacture
- Precast Concrete - Construction (Part 1)
- Precast Concrete - Construction (Part 2)
- Precast Concrete - Measurement and Payment