(Created page with "== Instructions for the Administering Section of a Contract or Project == === Accessing ACIA For the First Time === Go to this link: https://acia.deldot.gov/home and then select “Request Access” Completely fill out the form on the screen. <div style="background-color: #4472C4; color: white; width: 600px; margin: auto; border-left: 8px solid #4472C4; border-radius: 10px; box-shadow: 6px 6px 6px grey;"> When sele...")
 
 
(10 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Instructions for the Administering Section of a Contract or Project ==
<span id="BackToTop";></span>
{{Backtotop}}
  <div
  style="float: right; width: 30%;list-style-type: none"
  class="noautonum">
  __TOC__
  </div>
== Instructions for the Administering Section of a Contract or Project ==
   
   
=== Accessing ACIA For the First Time ===
=== Accessing ACIA For the First Time ===
Video Instructions: [[Media:ACIA Intro project.mp4|Using ACIA for the First Time (1:27)]]
Go to this link: https://acia.deldot.gov/home and then select “Request Access”.  We recommend using Google Chrome or Microsoft Edge.  Do not use Microsoft Internet Explorer.
   
   
Go to this link: https://acia.deldot.gov/home and then select “Request Access”
Completely fill out fields on the form on the screen.  
When selecting a Role:
Completely fill out the form on the screen.  
<ul>
<div style="background-color: #4472C4;
        color: white;
        width: 600px;
        margin: auto;
        border-left: 8px solid #4472C4;
        border-radius: 10px;
        box-shadow: 6px 6px 6px grey;">
When selecting Role:
<ul class="white";>
<li>Be sure to select either PROJECT INSPECTOR or PROJECT MANAGER depending on your role in the field</li>
<li>Be sure to select either PROJECT INSPECTOR or PROJECT MANAGER depending on your role in the field</li>
<li>It's important that you choose the role that contains the word PROJECT.  These roles differ from other similar roles available to choose from</li>
<li>It's important that you choose the role that contains the word PROJECT.  These roles differ from other similar roles available to choose from</li>
</ul>
</ul>
</div>


This will be approved in the system, and you will then have access to the full live version of our ADA  
This will be approved in the system, and you will then have access to the full live version of our ADA inspection application.   
inspection application.   
 
DO NOT USE INTERNET EXPLORER    Chrome will work best
   
   
You should now be able to Log in to ACIA from the home page: https://acia.deldot.gov/home
   
   
You should now be able to Log in to ACIA form the home page    https://acia.deldot.gov/home
=== After Receiving Your ADA Report From Engineering Support ===
   
   
  AFTER RECEIVING YOUR ADA REPORT FROM ENGINEERING SUPPORT
==== Project Manager Steps - Part 1 ====
  <div class="num_ol">
<ol>
<li>In the Inspection Summary  you will see the projects listed that you manage</li>
    <ol>
    <li>Select <span class="blue";> View/Edit </span> for the Project you would like to work on </li>
    </ol>
<li>Now you will see a List of  Assignments for that Project</li>
    <ol>
    <li>Select <span class="blue";>View Inspection</span> for the Assignment you want to work on to see a LIST of all the  facilities that were inspected on that assignment</li>
        <ol>
        <li>You are able to select <span class="blue";>Review Complete</span> for Any  facility and see the data and photos that were taken during inspection</li>
        <li>Select <span class="blue";>Review Complete</span> for the Facilities that are marked FAIL</li>
        <li>At the BOTTOM  of the Screen there is a button that says <span class="blue";>Assign Reinspection</span> Select this  and it will be Assigned to the Project Inspector</li>
        </ol>
    </ol>
<li>REPEAT these steps for All of the Failing Facilities within EACH of the  Assignments for that project.   
    <ol>
    <li>Let your Project Inspector know that they are ready for reinspection—there is no automatic way to do this </li>
    </ol>
</ol>
'''Once the Project Inspector is done there is still another step for you to complete'''
   
   
Project Manager Steps
==== Project Inspector Steps ====
  <ol>
1) In the Inspection Summary  you will see the projects listed that you manage
<li>Log in to ACIA - In the Inspection Summary you will see a list of Projects you are assigned to </li>
                Select  View/Edit  for the Project you would like to work on
    <ol>
    <li>Select <span class="blue">View/Edit</span> for the Project you are working on </li>
2)Now you will see a List of  Assignments for that Project—
    </ol>
                                Select View Inspection for the Assignment you want to work on to see a LIST of all the
<li>Now you will see a List of Assignments for that Project </li>
facilities that were inspected on that assignment
    <ol>
                                                You are able to select  Review Complete  for Any  facility and see the data and
    <li>Select <span class="blue">View Inspection</span> for the Assignment you are starting with and you will see a list of all the facilities that were inspected on that assignment -at the bottom of the page there is a MAP that shows the facilities on that assignment as well </li>
photos that were taken during inspection
    <li>You will be able to select <span class="blue">Perform Reinspection</span> for any facilities that were Re-Assigned by the Project Manager </li>
                                                Select  Review Complete  for the Facilities that are marked FAIL 
    <li>This will take you to a page that shows a Diagram of a standard facility for reference and all the Data that was collected during the inspection process.  Under Comments, you will see notes about what was non-conforming on that facility and under Location Photos, you may see photos that were taken of the facility during inspection </li>
                                                At the BOTTOM  of the Screen there is a button that says  Assign
    <li>To Correct a facility please follow the following steps </li>
Reinspection  Select this  and it will be Assigned to the Project Inspector
        <ol>
                3)  REPEAT these steps for All of the Failing Facilities within EACH of the  Assignments for that
        <li>Make sure that whatever the issue was it has been corrected--- Take a photo of any work that was Re-done, any new panels, grinding, filled gaps, DWS etc.  that were part of a correction </li>
project.   
        <li>Re-Measure any Failing Measurements and Change the corresponding Data field on the form. </li>
                                Let your Project Inspector know that they are ready for reinspection—there is no
        <li>Be sure to re-measure ALL of the corresponding measurements for any Panel Replacements </li>
automatic way to do this
        <li>Take photos of the Level to verify if necessary and Make Comments saying what work was done to remediate a situation or if NO work had to be done please justify this in the comments as well and with a photo if needed </li>
               
        <li>IF an RPE is being requested or has been located for a facility that can be attached in the documents by the Project Inspector OR the Project Manager. </li>
Once the Project Inspector is done there is still another step for you to complete
        <li>Once this is complete select <span class="blue">SAVE</span> at the bottom of the screen </li>
        <li>REPEAT for all failing facilities on a Project </li>
Project Inspector Steps  
        </ol>
   
    </ol>
1) Log in to ACIA     In the Inspection Summary you will see a list of Projects you are assigned to  
<li>Let the Project Manager know that this has been completed—there is no automatic way to do this </li>
a. Select View/Edit for the Project you are working on  
  </ol>
2) Now you will see a List of Assignments for that Project  
 
a. Select View Inspection for the Assignment you are starting with and you will see a list of  
==== Project Manager Steps - Part 2 ====
all the facilities that were inspected on that assignment -at the bottom of the page there  
For verification purposes, and in case any Documents or RPEs and additional notes need to be added to a facility, the Project Manager is required to log back in and review the corrections that were made by the Project Inspector.  
is a MAP that shows the facilities on that assignment as well  
<ol>
b. You will be able to select Perform Reinspection for any facilities that were Re-Assigned  
<li>Log in as before and once you are looking at the list of facilities within the assignment you can now select <span class="blue">Inspection Not Submitted</span> for any of the facilities you had previously reassigned. </li>
by the Project Manager  
    <ol>
c. This will take you to a page that shows a Diagram of a standard facility for reference and  
    <li>Once selected you will see the Data, photos, and other information for the facility you are reviewing – Please check to make sure that any corrections have been properly documented—if needed you can add RPEs to the Documents section  or additional photos and Comments. </li>
all the Data that was collected during the inspection process.  Under Comments you will  
    <li>Once complete select the button that says <span class="blue">Submit</span> </li>
see notes about what was non-conforming on that facility and under Location Photos  
    </ol>
you may see photos that were taken of the facility during inspection  
<li>Once this has been done for ALL of the facilities in a project  send an email to [mailto:dot.adasupport@delaware.gov DOT.ADASupport@delaware.gov] requesting a re-evaluation---Include as an attachment your original ADA report from Engineering Support </li>
d. To Correct a facility please follow the following steps  
</ol>
i. Make sure that whatever the issue was it has been corrected--- Take a photo of  
  </div>
any work that was Re-done, any new panels, grinding, filled gaps, DWS etc.  that  
Your ADA Acceptance Memo will be issued upon the completion of this process—but only after the Annotated Initial and Final Inspection punch lists are submitted
were part of a correction  
ii. Re-Measure any Failing Measurements and Change the corresponding Data field  
on the form.  
iii. Be sure to re-measure ALL of the corresponding measurements for any Panel  
Replacements  
iv. Take photos of the Level to verify if necessary and Make Comments saying what  
work was done to remediate a situation or if NO work had to be done please  
justify this in the comments as well and with a photo if needed  
v. IF an RPE is being requested or has been located for a facility that can be  
attached in the documents by the Project Inspector OR the Project Manager.  
vi. Once this is complete select   SAVE at the bottom of the screen  
e. REPEAT for all failing facilities on a Project  
3) Let the Project Manager know that this has been completed—there no automatic way to do this  
   
Project Manager part 2 (once the Project inspector is finished)
                For Verification purposes and in case any Documents or RPE’s and additional notes need to be  
added to a facility   the Project Manager is required to log back in and review the corrections that were  
made by the Project Inspector.  
1. Log in as before and once you are looking at the list of facilities within the assignment you can  
now select Inspection Not Submitted for any of the facilities you had previously reassigned.  
a. Once selected you will see the Data, photos and other information for the facility you  
are reviewing – Please check to make sure that any corrections have been properly  
documented—if needed you can add RPE’s to the Documents section  or additional  
photos and Comments.  
b. Once complete select the button that says Submit  
2. Once this has been done for ALL of the facilities in a project  send an email  
to dot.adasupport@delaware.gov   requesting a re-evaluation---Include as an attachment your  
original ADA report from Engineering Support  
   
Your ADA Acceptance Memo will be issued upon the completion of this process—but only after the  
Annotated Initial and Final Inspection punch lists are submitted

Latest revision as of 16:03, 25 February 2022

Instructions for the Administering Section of a Contract or Project

Accessing ACIA For the First Time

Video Instructions: Using ACIA for the First Time (1:27)

Go to this link: https://acia.deldot.gov/home and then select “Request Access”. We recommend using Google Chrome or Microsoft Edge. Do not use Microsoft Internet Explorer.

Completely fill out fields on the form on the screen. When selecting a Role:

  • Be sure to select either PROJECT INSPECTOR or PROJECT MANAGER depending on your role in the field
  • It's important that you choose the role that contains the word PROJECT. These roles differ from other similar roles available to choose from

This will be approved in the system, and you will then have access to the full live version of our ADA inspection application.

You should now be able to Log in to ACIA from the home page: https://acia.deldot.gov/home

After Receiving Your ADA Report From Engineering Support

Project Manager Steps - Part 1

  1. In the Inspection Summary you will see the projects listed that you manage
    1. Select View/Edit for the Project you would like to work on
  2. Now you will see a List of Assignments for that Project
    1. Select View Inspection for the Assignment you want to work on to see a LIST of all the facilities that were inspected on that assignment
      1. You are able to select Review Complete for Any facility and see the data and photos that were taken during inspection
      2. Select Review Complete for the Facilities that are marked FAIL
      3. At the BOTTOM of the Screen there is a button that says Assign Reinspection Select this and it will be Assigned to the Project Inspector
  3. REPEAT these steps for All of the Failing Facilities within EACH of the Assignments for that project.
    1. Let your Project Inspector know that they are ready for reinspection—there is no automatic way to do this

Once the Project Inspector is done there is still another step for you to complete

Project Inspector Steps

  1. Log in to ACIA - In the Inspection Summary you will see a list of Projects you are assigned to
    1. Select View/Edit for the Project you are working on
  2. Now you will see a List of Assignments for that Project
    1. Select View Inspection for the Assignment you are starting with and you will see a list of all the facilities that were inspected on that assignment -at the bottom of the page there is a MAP that shows the facilities on that assignment as well
    2. You will be able to select Perform Reinspection for any facilities that were Re-Assigned by the Project Manager
    3. This will take you to a page that shows a Diagram of a standard facility for reference and all the Data that was collected during the inspection process. Under Comments, you will see notes about what was non-conforming on that facility and under Location Photos, you may see photos that were taken of the facility during inspection
    4. To Correct a facility please follow the following steps
      1. Make sure that whatever the issue was it has been corrected--- Take a photo of any work that was Re-done, any new panels, grinding, filled gaps, DWS etc. that were part of a correction
      2. Re-Measure any Failing Measurements and Change the corresponding Data field on the form.
      3. Be sure to re-measure ALL of the corresponding measurements for any Panel Replacements
      4. Take photos of the Level to verify if necessary and Make Comments saying what work was done to remediate a situation or if NO work had to be done please justify this in the comments as well and with a photo if needed
      5. IF an RPE is being requested or has been located for a facility that can be attached in the documents by the Project Inspector OR the Project Manager.
      6. Once this is complete select SAVE at the bottom of the screen
      7. REPEAT for all failing facilities on a Project
  3. Let the Project Manager know that this has been completed—there is no automatic way to do this

Project Manager Steps - Part 2

For verification purposes, and in case any Documents or RPEs and additional notes need to be added to a facility, the Project Manager is required to log back in and review the corrections that were made by the Project Inspector.

  1. Log in as before and once you are looking at the list of facilities within the assignment you can now select Inspection Not Submitted for any of the facilities you had previously reassigned.
    1. Once selected you will see the Data, photos, and other information for the facility you are reviewing – Please check to make sure that any corrections have been properly documented—if needed you can add RPEs to the Documents section or additional photos and Comments.
    2. Once complete select the button that says Submit
  2. Once this has been done for ALL of the facilities in a project send an email to DOT.ADASupport@delaware.gov requesting a re-evaluation---Include as an attachment your original ADA report from Engineering Support

Your ADA Acceptance Memo will be issued upon the completion of this process—but only after the Annotated Initial and Final Inspection punch lists are submitted